How to reduce the Fixed Investment :

Cost reduction idea:-

  1. In this Project Counter weight and ’ Load Lifting Mechanism ’ are not repeat NOT required, instead we use JIB in Diameter to balance it and transfer the loads from both sides. The Jibs take needed rotation and lock to Pick-up Centre, become “Foot over bridge” and then only the Horizontal Movement of Loads will be allowed.

  2. If Jib length decides the cost of Tower Crane abnormally, then we can think for Pick-up Centers in between at 50 Meters Jib Lengths and transfer the Loads.

  3. For Pick-up Centers: - “H” beam Metal Pillars on the four sides of Apartments / high rise buildings - taking the support of the Building without disturbing much the exterior - on the Building Top, the JIB Rotation Mechanism can be designed and thus, the cost for (stand alone) Tower Mast may be reduced.

0 like 
Like
Share
Leave a reply...
DISCOVER
CHAT
ALERTS
-2
DISCUSSIONS
-1
FEED