LOGIN
Rama Linga Swamy
INNOVATOR / ENTHUSIAST (Project Leader)
 · TirupatiIndia
Edit
Delete
Share
Report
TASK
Open
  ·  Close Task

Is there any possibility to ‘develop ‘ software application / coding for the ‘Topic ’.
With this development of the software, we can expect disruptive attitude / technologies
in the present Transport Systems.
Project details Link:-
https://docs.google.com/document/d/1O3FRBnFK_ed6xeobCAWhCg9Qn-4V9gxf2xbe_z9LkZU/edit
Coding Topic:-
‘Metro Rail‘travels say 5 km in a route, i.e., 5000 meters = 500000 cms.
The circumference of the Wheel of the Train is 70*22/7 = 220 cm.
Hence, to cross the 5 km distance, the train wheel has to rotate = 500000/220 =2273 times.
In other words, the wheel has to rotate 2273 times to reach 5 km distance.
Can we develop coding for the braking system to stop the train exact place like, when the route digital counter shows / reaches (say) 1st station at 1254, 2nd station at 1732, 3rd station at 2015…… like that.
When the train reaching 1st station, i.e., digital counter nearing 1254 revolutions, the software sends signal to braking system I, II, III, etc which will apply brakes slowly and finally stops and locks at 1254th revolution.
Example:- In our two-wheeler we are having Speedo Meter. It shows Vehicle Speed as 0 k.m. – 30 k.m. – 60 k.m., etc In that Meter, we are having Distance Meter also. It shows the distance travelled by the Vehicle as 12435.6 – 12435.9, etc
Can we develop using / sending signal to clutch variator

0 like 
Like
Share
Load 1 previous comments
Alaa Akram
Student
 · GizaEgypt
Edit
Delete
Share
Report

Can you explain more about Railway Rail Leaks?
I cannot get the idea clearly
#Question

0 like 
Bi Sh
Design Invention Research
 · KathmanduNepal
Edit
Delete
Share
Report

Rather than Encoding Position Data from Rotation Wheel, If we do it from the Rail Tracks itself… there is contact with Rail Track… via Wheel and we can design few Special Wheels for FailSafe Interaction between Rail Track and Wheel. We can Encode the Rail Track wherever is necessary… for example, 1 Km away from Station, at the Station and so on.

0 like 
Rama Linga Swamy
INNOVATOR / ENTHUSIAST (Project Leader)
 · TirupatiIndia
Edit
Delete
Share
Report

Good. What I understand from the above discussion, is that, when a train wheel crosses a point on track, it will send signal to needed applications. But, in a train there will be number of wheels and all the wheels cross / touch the ‘point’ on track. Of course, we can design for the first touch of the wheel and remain silent, till other wheels crosses.
Once, we can get the design is ready, we can plan to stop the metro train at exact point, so that 20-passenger filled trolleys can be shifted through modified tower cranes.

2 likes 
Akul Verma
civil engineering student
Edit
Delete
Share
Report

sir m very much interested in this idea and yea we can make a software which can move the train exactly we desired

0 like 
Rama Linga Swamy
INNOVATOR / ENTHUSIAST (Project Leader)
 · TirupatiIndia
Edit
Delete
Share
Report

Thank you very much for your Energy and Excitement. If you can form a Team with Mechanical Engineering Student and Electrical Engineering Student and also a Software Engineer - in your College and with the guidance from Professors, we can do miracles.

0 like 
Akul Verma
civil engineering student
Edit
Delete
Share
Report

i can ask my computer engg. frnd to work on this software

0 like 
Leave a reply...
DISCOVER
CHAT
ALERTS
-2
DISCUSSIONS
-1
FEED